Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Tavora / Materials & makers

Chosen with intention.

A starting point for your specification conversation. Explore materials and established product makers, then select against your project’s actual requirements.

A study in useful details — design concept
Appliances

Miele

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Worktops & surfaces

Cosentino

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection
Cabinet hardware

Blum

Explore the maker’s current collections and technical information. We review the selected model, dimensions, finish and installation requirements as part of the project specification.

Visit the official collection

Brand names identify products for consideration. They do not imply an authorised dealership, endorsement or partnership. Availability, supply, installation and manufacturer warranty terms are confirmed for the selected products.

From inspiration
to specification.

Review samples in the setting where they will be used. Consider cleaning, maintenance, exposure and the details where materials meet. Final product information should be coordinated with the drawings before purchasing or fabrication.

Discuss your material brief
THE SPECIFICATION NOTEBOOK

Choose with the whole life of the material in mind.

Compare the use, installation and care of each selected product. Samples establish a direction; the final schedule should identify the exact references, locations, quantities and responsible suppliers.

Kitchen storage concept with organised crockery in deep pale oak drawers beneath a porcelain worktop.
Original design concept

Porcelain or sintered surfaces

Where it contributes
A crisp worktop or splashback appearance with a wide choice of finishes.
Before approval
Check the exact product, edge detail, cut-outs, supports and fabrication requirements.
After installation
Use the manufacturer's current care instructions rather than treating all stone-look surfaces alike.

Engineered stone

Where it contributes
Consistent-looking worktops with selected colour and pattern options.
Before approval
Review the specified brand's heat, stain and impact guidance, and inspect the proposed joints.
After installation
Use protective boards and follow the selected manufacturer's cleaning guidance.

Painted, laminated or veneered fronts

Where it contributes
Different balances of texture, colour, repairability and everyday use.
Before approval
Compare real samples, edges, handles and the internal cabinet construction.
After installation
Keep a finish reference and avoid applying an unapproved cleaner or abrasive treatment.

Further product and planning research

Use current information from the relevant manufacturer or authority for the actual scope. These references do not imply a supplier partnership or endorsement.

YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your kitchen design & renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry