Dubai · The Fitworks collection
+971 58 827 4544WhatsApp
Tavora / SPECIALIST SERVICES

Cabinet refacing in Dubai

Keep the good foundations. Refresh the finish.

Refacing can be suitable when existing cabinet carcasses and the layout remain sound. Assess the condition, hinges and dimensions before selecting new fronts and hardware.

Discuss this service
Oak kitchen cabinetry and a long porcelain-topped island
Kitchen design & renovation concept · Visual direction
THE SCOPE

Define it clearly.
Deliver it thoughtfully.

Refacing can be suitable when existing cabinet carcasses and the layout remain sound. Assess the condition, hinges and dimensions before selecting new fronts and hardware. Your proposal identifies the agreed work packages, material choices and responsibilities for your specific property.

01

Existing cabinet assessment

02

Door and hardware compatibility

03

Finish and handle selection

04

Installation and alignment

BEFORE DESIGN IS FINALISED

The right questions
at the right time.

Are the carcasses suitable to retain?

Does the existing layout still work?

Which hardware should be replaced?

We work through these decisions using the existing property information, site conditions and your priorities. Any specialist review or approval responsibility is identified in the project proposal.

BUDGET & PROGRAMME

Start with the scope.

A useful price follows measured quantities and an agreed specification. For cabinet refacing, the scope and installation interfaces matter as much as the visible finish.

Read our cost guidance

What shapes the proposal

  • Cabinet quantity and internal storage
  • Worktop material, edges and joints
  • Appliances and service changes
  • Removal, preparation and installation

The programme separates design, external reviews, procurement and site work. It also records the decisions needed from you before orders or installation can proceed.

CONNECTED EXPERTISE

Plan the adjoining details.

A CLOSER LOOK AT THE SCOPE

Confirm the retained kitchen is worth retaining.

Refacing focuses on visible cabinet elements while retaining suitable existing construction. Assess the carcasses, hardware, layout and the condition around water and appliances before committing. The proposal should identify exactly which doors, panels, handles, hinges or other parts are replaced, and how old and new elements will be matched and adjusted.

Explore the concept library
Working kitchen concept with forest-green cabinets, a walnut island and clear circulation.
Original AI-generated design study · Concept illustration

Four points to carry into the brief

  • Carcass and hardware condition
  • Retained layout and storage suitability
  • Exact replacement and making-good scope
  • Finish matching and adjustment responsibilities

From a decision to a clear appointment

Keep the agreed choices with the current drawings and specification. Identify who designs, supplies and installs each element, and how the work connects to neighbouring packages.

The proposal should also record any remaining investigations, product information and handover requirements. Resolve changes in writing so their effect on the scope and programme can be reviewed.

Review the project standards
YOUR QUESTIONS, ANSWERED

A clearer next step.

Practical answers for your kitchen design & renovation brief.

Browse all common questions

THE NEXT CHAPTER

Let’s make room
for your plans.

Tell us what you have in mind. Start a conversation or send a written project brief.

Send a project enquiry